Autonomous hybrid hydrogen power plant.
Autonomous hybrid hydrogen power plant.
Development and commercialization of a modular power unit that produces “green” hydrogen from water using electrolysis, stores it, and then converts it into electricity using fuel cells. A solution for autonomous power supply to remote facilities, residential homes, and industrial enterprises with a payback period of up to 5 years.
0
Coins paid
400,000
Available to investors
50,000
Promotion Fund
1.17 USD
1 Startix-BEZ
1
Participants

Project description

🚀 About the Project

The project “H2-Hybrid Station” is aimed at creating an accessible and reliable autonomous power unit of a new generation. We combine proven water electrolysis technologies, safe hydrogen storage systems, and highly efficient fuel cells to provide stable electricity to facilities located far from central grids, as well as to smooth out peak loads in local energy systems.

🌱 Key advantage: Unlike traditional generators, our unit does not produce harmful emissions, is silent, and can operate in a fully autonomous mode, using only water and renewable or cheap electricity (for example, from solar panels or wind turbines) as raw material.

💡 Technological Challenge and Innovations

  • 💰 Reducing the cost of hydrogen: The main task is to use advanced but inexpensive materials for electrolyzers (for example, new catalysts without platinum) and to increase the overall efficiency of the process. We plan to achieve a cost of produced hydrogen below $3 per kg.

  • ⚙️ System Integration: Develop an intelligent control system (SCADA) that will optimize the operation of all components (electrolyzer, storage unit, generator) based on current energy consumption and electricity availability.

  • 📡 Digital Control: Create a reliable automation and remote monitoring system for the safe and uninterrupted operation of the installation, including peak load forecasting and fault diagnostics.

  • 🧩 Modularity: The installation will have a modular design with a power output of from 5 to 100 kW, allowing it to be scaled to any needs — from an individual house to a small production workshop.

  • 📈 Market Potential and Economics

    The global hydrogen energy market is growing rapidly. Our technology is aimed at the distributed energy segment, which is experiencing enormous demand due to economy decarbonization and the rising cost of traditional fuels. Investments in prototype development will be recouped within 3–5 years through:

    • ✅ Sales of finished installations to legal and natural persons.

    • ✅ Provision of the “Energy as a Service” service (installation and maintenance for a subscription fee).

    • ✅ Sales of surplus hydrogen as a commercial product.

    🤝 Who We Need

    💰 For Investors

    We offer an opportunity to invest in future technology with enormous market potential. The project aligns with the global trend of decarbonization. Join at an early stage to secure the maximum share.

    🔧 For Contractors

    We are looking for talented energy engineers, chemical technologists, materials scientists, and programmers. A unique opportunity to work on a complex task at the intersection of chemistry, electrical engineering, and IT.

    🔗 Useful Links and Videos

    Familiarize yourself with key materials demonstrating the promising nature of this field and current Russian developments:

    Freelance tasks

    Propose several configuration options (e.g., with different types of electrolyzers: alkaline, PEM, AEM) and compare them in terms of cost and efficiency. Specific capital costs for electrolyzers can vary significantly depending on the technology.

    200.00 Startix-BEZ ≈ 234.00 USD Looking for a contractor

    Conduct a techno-economic feasibility study: estimate capital expenditures (CAPEX) for prototype development, operating expenditures (OPEX), and the payback period. The calculations should take into account that electricity costs account for 50–80% of the hydrogen production cost.

    200.00 Startix-BEZ ≈ 234.00 USD Looking for a contractor

    Perform an energy balance calculation for the unit: determine the amount of hydrogen required to generate 5 kWh of electricity, and calculate the water and electricity consumption for electrolysis.

    200.00 Startix-BEZ ≈ 234.00 USD Looking for a contractor

    Important announcement

    🚀 Looking for a team to develop a hydrogen power plant!

    The "H2-Hybrid Station" project is recruiting contractors for a series of engineering tasks. We are creating a prototype of an autonomous 5 kW power plant based on water electrolysis and fuel cells. This is a real opportunity to apply your knowledge in a cutting-edge field of energy!

    We are looking for specialists in the following areas:

    Energy Engineer / Process Engineer — for energy balance calculations, feasibility studies, and equipment selection (experience with electrolyzers or fuel cells is preferred).

    Design Engineer (3D Modeling) — for developing 3D models and engineering documentation (SolidWorks, Kompas).

    ICS (Industrial Control Systems) Specialist — for developing control schemes and programming specifications.

    Test Engineer — for commissioning and prototype testing.

    Work Conditions:

    Remote format (in-person meetings in Moscow/St. Petersburg may be possible).

    Flexible schedule, milestone-based payment.

    Budget for engineering work: from 300,000 to 550,000 ₽ (depending on scope and qualifications).

    Opportunity for long-term cooperation in the subsequent stages of the project.

    To join the team, send me a direct message on the platform or apply to this posting. Please attach a link to your portfolio or a description of relevant experience.

    Join us in creating the technology of the future! 💡🔋

    Planned cost structure

    R&D and engineering design
    117,072.00 USD
    Development and manufacturing of electrolyzers
    111,219.00 USD
    Hydrogen storage and delivery system
    81,951.00 USD
    Fuel cell stack and power electronics
    105,365.00 USD
    Automation and Process Control Systems
    58,536.00 USD
    Commissioning and testing
    52,683.00 USD

    Project Team

    MIK
    MIK
    Managing Partner

    Project news and discussions

    Latest messages in the project's general forum

    There are no messages in the project forum yet.